Notlith
EN
ENPrimary navigation
Subscriptions
Notlith← Back
EN

Notlith · Letterkenny

Property video in Letterkenny for homes repaired or rebuilt after defective blocks

Across County Donegal, homes built with concrete blocks containing excessive mica have cracked, and the Enhanced Defective Concrete Blocks Grant Scheme, administered by Donegal County Council, funds their repair or rebuilding. When one of these houses comes to the Letterkenny market, buyers have questions before they look at the kitchen. Notlith makes property videos that answer them in order, built remotely from photographs, plans and the documents the seller chooses to share.

Remote production · From your photos

person standing in front of glass doors facing a sunset landscape
Fictional property concept created with AI. It does not show a Letterkenny home, a remediated house or any client listing. AI transparency

Buyers who already know the word

In Donegal, many buyers have friends or family who lived through cracked walls and the long process of applying for help. They do not need the problem explained; they need to know quickly what happened to this particular house and what evidence exists. A video that opens on soft furnishings and avoids the subject makes them more suspicious, not less.

So the first thirty seconds state what the seller has agreed to say: the house was affected, the work was carried out, and the documents are available from the agent. Wording is approved by the agent and seller before anything is edited.

Rebuilt from the ground or repaired at the outer leaf

The scheme sets out five remediation options. Option 1 is demolition and rebuilding on the original footprint; the others cover external walls in varying depth, down to Option 5, which replaces only the outer leaf of the affected walls. For a buyer, the difference between those is the whole story.

The video names the option only as it appears in the seller’s paperwork, and shows which walls were replaced on a simple diagram drawn from the contractor’s plans. We never describe a house as tested, certified or free of defects unless the documents say exactly that.

Scaffolding photographs, kept in sequence

Owners who went through remediation often have hundreds of phone photographs: walls stripped back, foundations, new blockwork, insulation going in, scaffolding coming down. Put in the right order, with dates as captions, they show the care taken better than any narration.

We sort and grade these images, crop out neighbours and number plates, and set them against the finished rooms photographed in daylight. Nothing is generated to fill a gap in the record; if a stage is missing, the timeline simply says so.

The same footprint, with different rooms

A rebuild on the original footprint can still change a house inside: a new layout, new windows, a better energy rating. Buyers comparing it with older houses on the same road want to see what changed and what stayed, including the garden, outbuildings and boundary walls.

We show the old layout and the new one side by side, from the plans, and caption the energy rating only from the certificate. A shorter version for portals keeps the rebuilt walls and finished rooms, and points to the agent for the documents.

Catalog demonstration

See the production approach

Fictional property concept created with AI. It does not show a Letterkenny home, a remediated house or any client listing. AI transparency
English, adaptable to your language

Plan the details

Should the video mention defective blocks at all?

That is the seller’s and agent’s decision. Where a house has been remediated, saying so clearly is often more reassuring than leaving buyers to ask.

Can you show the grant documents on screen?

Only the pages the seller approves, with personal details removed. Most videos simply state that documents are available from the agent.

Can you add furniture to rooms that are still empty after the rebuild?

Yes, as virtual staging labelled on screen, without changing walls, windows or the size of any room.

What if we have few photographs of the works?

We use what exists, in order, and the contractor’s or engineer’s images if they agree. Missing stages are acknowledged rather than illustrated.

Start with your images

Send us the listing text, the floor plans before and after, the photographs of the works and the documents the seller wants mentioned, and we will outline the video.

Your finished film within 48 hours

For standard packages, the deadline starts once the required payment, any necessary permission to begin and the complete brief with usable photos are received. Requested revisions follow delivery. Bespoke projects have a schedule confirmed in the quote.

Order your filmFor more information: request a quote
Request a free 15-second trial (Notlith logo and watermark)

Trial delivered in 24–48 hours after usable materials are received, subject to available daily slots. Includes the Notlith logo and watermark.

Agency benchmark: €7,000–€25,000 for an SME corporate film. This scope may include on-site filming and differs from our films made from your photos. La Fabrique du Net.

NOTLITH

Your film, your budget.

An automatic guide using your goal, length, volume and budget. Your free-text idea is not analysed automatically. Your answers stay in this window.